Home → Area Guides → Highlands Ranch

ADU Guide for Highlands Ranch Homeowners

Highlands Ranch sits in unincorporated Douglas County — HOAs govern most lots, and Colorado’s HB 24-1152 changed the rules entirely. Here’s what that means for your property.

ADU Rules at a Glance

ADUs Allowed?✅ Yes — HB 24-1152 overrides prior HOA restrictions
Maximum Size1,000 sq ft or 50% of primary home area
ADU Types PermittedDetached, attached, basement, garage conversion
Owner-Occupancy Required?Not required under HB 24-1152
Parking Requirement1 space per ADU
HOA Override?HOAs cannot prohibit ADUs per HB 24-1152; design standards may still apply
Short-Term Rental (STR)?Douglas County STR rules and HRCA rules apply; verify before renting
Permit PathDouglas County Building Division; administrative approval for compliant ADUs
Estimated Permit Timeline10–16 weeks; HRCA design review may add 2–4 weeks
Official SourceDouglas County Planning & Community Development

⟳ Last reviewed: October 2026. ADU rules change. Always verify current code with Highlands Ranch before starting a project. View official source →

What This Means for Homeowners

Highlands Ranch is one of the best ADU markets in Colorado despite its HOA-heavy reputation. HB 24-1152 directly addressed the HOA prohibition issue that previously blocked most projects here. The community’s 105,000 residents, high household incomes, large walk-out lots, and established neighborhood desirability make ADU rental income strong. The HRCA (Highlands Ranch Community Association) still has architectural standards, but they cannot prohibit your ADU — they can only regulate aesthetics like materials and colors.

Key Considerations

  • HRCA architectural review is still required — plan for 2–4 weeks of additional review time
  • HRCA can require design compatibility (matching siding, roof materials) but cannot deny the ADU itself
  • Douglas County Building Division handles permits — not a city permit department
  • Walk-out basements are extremely common on Highlands Ranch’s sloped lots — often the best first option
  • Strong rental market: proximity to Lockheed Martin, Charles Schwab, and other employers drives demand
  • Permit fees in Douglas County are generally lower than Denver proper

Not sure if your lot qualifies? The ADU quiz takes 3 minutes and gives you a personalized eligibility summary based on your property type, location, and goals. Take the free ADU quiz →

ADU Cost Snapshot: Highlands Ranch

Detached Backyard Cottage$210,000–$390,000
Garage Conversion$55,000–$140,000
Basement ADU Conversion$42,000–$115,000
Permit Fees (estimate)$3,000–$9,000 (Douglas County Building Division)
Utility Tap Fees (detached)$5,000–$15,000 (Centennial Water and Sanitation District)
Estimated Monthly Rent$1,800–$3,000/month
Estimated Break-Even7–11 years for detached; 3–5 years for walk-out basement

Local note: HRCA architectural review typically adds 2–4 weeks and a review fee ($200–$500) but rarely adds construction cost. Walk-out basements on sloped lots are the most common and cost-efficient ADU path here.

Cost ranges reflect 2026 Denver metro construction pricing. Individual project costs depend on site conditions, finishes, utility distances, and contractor selection. Get multiple bids before committing to a budget.

Sources & Official References

Official Sources

Rules and fees change. Always verify current requirements directly with your local jurisdiction and utility provider before starting a project.

Check Your Property

Answer 7 questions to see your estimated cost range, likely ADU type, and local eligibility — free, no sign-up required.