Home → Area Guides → Englewood

ADU Guide for Englewood Homeowners

Englewood’s compact lots, light rail connections, and strong rental demand make it one of the most interesting ADU markets in the south metro. Here’s what the rules look like for your property.

ADU Rules at a Glance

ADUs Allowed?✅ Yes — subject jurisdiction under HB 24-1152
Maximum Size1,000 sq ft or 50% of primary home area
ADU Types PermittedDetached, attached, basement, garage conversion
Owner-Occupancy Required?Not required under HB 24-1152
Parking Requirement1 space per ADU; waiver near light rail
HOA Override?HOAs cannot prohibit ADUs per HB 24-1152
Short-Term Rental (STR)?Englewood STR permit required; verify ADU-specific rules
Permit PathAdministrative approval through Englewood Community Development
Estimated Permit Timeline8–12 weeks
Official SourceCity of Englewood Community Development

⟳ Last reviewed: October 2026. ADU rules change. Always verify current code with Englewood before starting a project. View official source →

What This Means for Homeowners

Englewood is a compact, affordable, and well-located city between Denver and Littleton — a 35,000-person community with easy highway and light rail access. The city’s smaller lot sizes favor basement ADUs and garage conversions over detached structures. Proximity to the Swedish Medical Center employment corridor and light rail stations keeps rental demand consistent. Englewood has relatively straightforward permitting and competitive permit fees.

Key Considerations

  • Smaller lots in Englewood favor basement ADUs and garage conversions over detached structures
  • Proximity to CityCenter Englewood light rail station may qualify many properties for parking waivers
  • Swedish Medical Center and Craig Hospital employment corridors drive consistent rental demand
  • Englewood’s mix of original owners and investors means the ADU market is more active than its size suggests
  • Some older Englewood homes have below-grade basements that may need egress improvements for legal ADU use
  • Permit process is straightforward — Englewood has a smaller permit department that can be easier to work with

Not sure if your lot qualifies? The ADU quiz takes 3 minutes and gives you a personalized eligibility summary based on your property type, location, and goals. Take the free ADU quiz →

ADU Cost Snapshot: Englewood

Detached Backyard Cottage$195,000–$355,000
Garage Conversion$48,000–$130,000
Basement ADU Conversion$36,000–$100,000
Permit Fees (estimate)$2,800–$8,500
Utility Tap Fees (detached)$5,000–$13,000 (Englewood Utilities)
Estimated Monthly Rent$1,600–$2,600/month
Estimated Break-Even6–10 years for detached; 2–5 years for conversion

Local note: Englewood offers some of the strongest ADU ROI in the south metro because construction costs are moderate and rental demand is consistent. Smaller lots favor conversions over detached builds — and garage and basement conversions here often break even in under 4 years.

Cost ranges reflect 2026 Denver metro construction pricing. Individual project costs depend on site conditions, finishes, utility distances, and contractor selection. Get multiple bids before committing to a budget.

Sources & Official References

Official Sources

Rules and fees change. Always verify current requirements directly with your local jurisdiction and utility provider before starting a project.

Check Your Property

Answer 7 questions to see your estimated cost range, likely ADU type, and local eligibility — free, no sign-up required.