Home → Area Guides → Denver
Denver approved citywide ADU access across all residential zones in November 2024. Here’s what the city’s specific rules mean for your property — before you talk to a single builder.
| ADUs Allowed? | ✅ Yes — citywide across all residential zones as of November 2024 |
| Maximum Size | 1,000 sq ft (or 50% of primary home, whichever is less) |
| ADU Types Permitted | Detached, attached, garage conversion, basement ADU, and JADU |
| Owner-Occupancy Required? | Required at time of construction completion; not required for ongoing ownership |
| Parking Requirement | No additional parking required for ADUs within ½ mile of a transit stop; 1 space otherwise |
| HOA Override? | HB 24-1152 limits HOA authority — HOAs cannot prohibit ADUs in covered jurisdictions |
| Short-Term Rental (STR)? | Short-term rentals allowed with a Denver STR license; separate license required for ADU |
| Permit Path | Administrative approval — no public hearing required for compliant ADUs |
| Estimated Permit Timeline | 6–14 weeks typical; varies by project complexity |
| Official Source | Denver Community Planning & Development |
⟳ Last reviewed: October 2026. ADU rules change. Always verify current code with Denver before starting a project. View official source →
Denver has one of Colorado’s most permissive ADU frameworks. Every residential lot in the city can now add an ADU, and the permit process is administrative — meaning no neighborhood vote or public hearing stands between you and approval. The most common sticking points are the rear 35% lot placement rule (the ADU must fit within the rear 35% of your lot), the 15-foot separation requirement from the primary home, and utility connection costs — especially Denver Water’s separate water supply license and system development charge, which can add $10,000–$20,000 to a detached project.
Not sure if your lot qualifies? The ADU quiz takes 3 minutes and gives you a personalized eligibility summary based on your property type, location, and goals. Take the free ADU quiz →
| Detached Backyard Cottage | $220,000–$400,000 |
| Garage Conversion | $65,000–$150,000 |
| Basement ADU Conversion | $45,000–$120,000 |
| Permit Fees (estimate) | $4,000–$12,000 (varies by project valuation) |
| Utility Tap Fees (detached) | $10,000–$22,000 for detached ADU (Denver Water separate water supply license + system development charge) |
| Estimated Monthly Rent | $1,900–$3,200/month depending on size and neighborhood |
| Estimated Break-Even | 7–12 years for detached; 3–6 years for basement conversion |
Local note: Denver’s tap fees are among the highest in the metro — budget for them early. The Denver Water separate water supply license alone can run $8,000–$15,000 before construction fees.
Cost ranges reflect 2026 Denver metro construction pricing. Individual project costs depend on site conditions, finishes, utility distances, and contractor selection. Get multiple bids before committing to a budget.
Official Sources
Rules and fees change. Always verify current requirements directly with your local jurisdiction and utility provider before starting a project.
Answer 7 questions to see your estimated cost range, likely ADU type, and local eligibility — free, no sign-up required.