Home → Area Guides → Denver

ADU Guide for Denver Homeowners

Denver approved citywide ADU access across all residential zones in November 2024. Here’s what the city’s specific rules mean for your property — before you talk to a single builder.

ADU Rules at a Glance

ADUs Allowed?✅ Yes — citywide across all residential zones as of November 2024
Maximum Size1,000 sq ft (or 50% of primary home, whichever is less)
ADU Types PermittedDetached, attached, garage conversion, basement ADU, and JADU
Owner-Occupancy Required?Required at time of construction completion; not required for ongoing ownership
Parking RequirementNo additional parking required for ADUs within ½ mile of a transit stop; 1 space otherwise
HOA Override?HB 24-1152 limits HOA authority — HOAs cannot prohibit ADUs in covered jurisdictions
Short-Term Rental (STR)?Short-term rentals allowed with a Denver STR license; separate license required for ADU
Permit PathAdministrative approval — no public hearing required for compliant ADUs
Estimated Permit Timeline6–14 weeks typical; varies by project complexity
Official SourceDenver Community Planning & Development

⟳ Last reviewed: October 2026. ADU rules change. Always verify current code with Denver before starting a project. View official source →

What This Means for Homeowners

Denver has one of Colorado’s most permissive ADU frameworks. Every residential lot in the city can now add an ADU, and the permit process is administrative — meaning no neighborhood vote or public hearing stands between you and approval. The most common sticking points are the rear 35% lot placement rule (the ADU must fit within the rear 35% of your lot), the 15-foot separation requirement from the primary home, and utility connection costs — especially Denver Water’s separate water supply license and system development charge, which can add $10,000–$20,000 to a detached project.

Key Considerations

  • ADU must be located in the rear 35% of the lot for detached units
  • Minimum 15-foot separation between a detached ADU and the primary home
  • Denver Water requires a separate water supply license for detached ADUs — budget $8,000–$20,000 for tap fees
  • Height limit is 24 feet for detached ADUs in most zones
  • Short-term rental requires a separate Denver STR license — rules for ADU STR use are evolving
  • Maximum lot coverage including ADU is typically 50% of the lot area

Not sure if your lot qualifies? The ADU quiz takes 3 minutes and gives you a personalized eligibility summary based on your property type, location, and goals. Take the free ADU quiz →

ADU Cost Snapshot: Denver

Detached Backyard Cottage$220,000–$400,000
Garage Conversion$65,000–$150,000
Basement ADU Conversion$45,000–$120,000
Permit Fees (estimate)$4,000–$12,000 (varies by project valuation)
Utility Tap Fees (detached)$10,000–$22,000 for detached ADU (Denver Water separate water supply license + system development charge)
Estimated Monthly Rent$1,900–$3,200/month depending on size and neighborhood
Estimated Break-Even7–12 years for detached; 3–6 years for basement conversion

Local note: Denver’s tap fees are among the highest in the metro — budget for them early. The Denver Water separate water supply license alone can run $8,000–$15,000 before construction fees.

Cost ranges reflect 2026 Denver metro construction pricing. Individual project costs depend on site conditions, finishes, utility distances, and contractor selection. Get multiple bids before committing to a budget.

Sources & Official References

Official Sources

Rules and fees change. Always verify current requirements directly with your local jurisdiction and utility provider before starting a project.

Check Your Property

Answer 7 questions to see your estimated cost range, likely ADU type, and local eligibility — free, no sign-up required.